Local Authority School
Local Authority & SENCO School
We won the tender to demolish the existing link corridor and construct a ‘link’ building which included a meeting room, classroom and hygiene room for this local authority SEN school. Due to the size of works being undertaken, it was necessary to commence works whilst the school was still operational. Owing to the additional needs of the pupils, this required an additional level of health and safety management by our team. We have since carried out various other contracts including the construction of another hygiene room, made alterations to the existing kitchen, as well as some smaller works.
I had a look around the building this morning – it all looks fantastic really pleased.
